مستودع الهيكل الصلبي

فيديوهات أخرى
February 20, 2025
Brief: Discover the Economic High Rise Building Steel Structure Prefabricated Modular Steel Buildings Warehouse, a versatile and cost-effective solution for industrial and commercial needs. Built with high-quality materials like H section steel beams and galvanized C purlins, this prefabricated steel structure offers durability and flexibility for various applications. Perfect for warehouses, workshops, and offices, it’s designed for quick assembly and long-term performance.
Related Product Features:
  • Main steel frame made of H section steel beams and columns, painted or galvanized for durability.
  • Secondary frame includes hot-dip galvanized C purlins, steel bracing, and tie bars for added stability.
  • Roof panels available in EPS, glass fiber, rock wool, or PU sandwich panels for insulation and strength.
  • Wall panels can be sandwich panels or corrugated steel sheets, offering versatility in design.
  • Tie rods made of circular steel tubes and braces from round bars ensure structural integrity.
  • Knee braces constructed from angle steel provide additional support.
  • Roof gutters made of color steel sheets for efficient water drainage.
  • Customizable designs and sizes to meet specific project requirements.
الأسئلة:
  • What materials are used in the construction of the steel structure warehouse?
    The warehouse uses H section steel beams and columns, galvanized C purlins, and various sandwich panels for roofs and walls. Additional components like tie rods, braces, and knee braces are made from high-quality steel materials.
  • Can the steel structure building be customized?
    Yes, the building can be fully customized. We offer design and engineering services to tailor the structure to your specific needs, including size, materials, and layout.
  • What is the typical project timeline for a steel structure warehouse?
    The timeline varies based on project size and complexity. For example, a recent project in Zimbabwe with a 500-ton steel structure took approximately two months from design to completion.